Vietnam’s Hoa Phat targets high-speed rail market with new Dung Quat rail plant

Tuesday, 23 December 2025 13:58:12 (GMT+3)   |   Istanbul

Vietnam-based steel producer Hoa Phat Group has officially broken ground on its Hoa Phat Dung Quat Rail and Special Steel Production Plant, marking a major step in the group’s strategy to expand into high-tech and value-added steel products.

The project is designed to supply high-speed railway rails and special steels for major rail infrastructure developments, with the first products targeted for market launch in 2027. 

The rail and special steel plant will contribute to state budget revenues, stimulate local industrial and service growth, reduce reliance on steel imports, and support Vietnam’s expanding transport infrastructure.

Plant location, capacity and investment

The facility is located in the Eastern Industrial Park of the Dung Quat Economic Zone in Quang Ngai province and will be developed on an area of nearly 15 hectares. It has a designed production capacity of 700,000 mt per year and represents a total investment exceeding VND 10 trillion ($379.75 million). 

The plant will be equipped with state-of-the-art production lines supplied by Germany-based SMS Group and UK-based Primetals Technologies, enabling consistent product quality that meets international high-speed rail standards.

Product range and regional positioning

The plant’s product portfolio will include high-speed rail rails, urban railway rails, crane rails, and a wide range of special steel profiles, such as U-, I-, H- and V-shaped sections.

Hoa Phat expects to become the first and only producer in Southeast Asia capable of manufacturing high-speed railway rails.

Quality control and international standards

By refining steel directly from low-impurity iron ore, Hoa Phat will be able to produce rails with lengths of up to 100 meters, featuring high straightness, flatness and rigidity.

Advanced laser and ultrasonic inspection systems will be used to control rail geometry and detect internal defects, ensuring strict quality assurance before market release. The rails are designed to comply with leading international standards, including EN 3674 (Europe), JIS E1120 (Japan) and TB/T 2344 (China).

The project has already completed land clearance and all required legal procedures. Construction commenced immediately after the groundbreaking ceremony, with equipment installation scheduled for mid-2026 and first rail production targeted for 2027, one year earlier than originally planned in the approved investment roadmap.

ElifKefeli
Elif Kefeli
Editor

I graduated from Yeditepe University’s Department of Translation and Interpreting Studies in 2017. I joined SteelOrbis in 2021, where I currently work as a content specialist. I am writing news reports and industry-related content with a special focus on decarbonization, green steel, sustainability, and recycling.


Similar articles

Hoa Phat plans $765 million expansion of Dung Quat rail steel project

11 Aug | Steel News

Hoa Phat advances decarbonization with third phase of rooftop solar project

21 Jul | Steel News

Vietnam’s Hoa Phat advances rail and special steel project, targets 2027 output

03 Apr | Steel News

Hoa Phat launches second phase of rooftop solar project to boost energy self-sufficiency

25 Mar | Steel News

Vietnam’s Hoa Phat to increase annual steel capacity to 22 million mt with new investment

20 Aug | Steel News

Hoa Phat commissions BOF and RH furnaces at Dung Quat 2, nearing project completion

13 Aug | Steel News

Canada launches C$100 million freight support program for domestic steel shipments

11 Aug | Steel News

Ex-China stainless steel spot prices stable, futures down amid rumors of higher ex-Indonesia nickel supply

11 Aug | Flats and Slab

Local Indian rebar prices show mixed trend, lack of retail buying weighs on regional markets

11 Aug | Longs and Billet

Vietnam's steel imports down 4.8 percent in July 2026 from June

11 Aug | Steel News