TMK subsidiary SinTZ completes installation of new polishing machine

Thursday, 24 December 2009 16:43:20 (GMT+3)   |  

The Russian pipe producer TMK Group (TMK) has announced that its subsidiary Sinarsky Pipe Plant (SinTZ) has completed the installation of a new polishing machine within the scope of its project for the construction of a long-length pipe mill at its pipe drawing shop No. 3,. 

The fully automatic polishing machine, supplied by Italian company Surface Engineering, is equipped with an up-to-date diagnosis system which enables the treatment of stainless pipes of up to 30 m in length at a speed of 25 m per minute.


Tags: Pipe Tubular Russia CIS 

Similar articles

Russia’s TMK ships first industrial batch of LD pipes with hybrid laser-arc welding

16 Mar | Steel News

MMK Group’s galvanized pipe output reaches record high in 2025

02 Feb | Steel News

Cybersteel boosts stainless pipe production in Russia with RUB 12 billion investment

01 Jul | Steel News

Severstal launches new piling pipe line in Russia’s Vologda region

24 Jun | Steel News

Russia’s Severstal starts production of new types of LD pipes for oil and gas

14 Mar | Steel News

Russia’s TMK masters heat treatment of LD pipes on an industrial scale

17 Oct | Steel News

Russia’s Severstal to make investment in thick sheet and pipe production

07 Jun | Steel News

Russia’s Severstal increases pipe capacity via rolling mill modernization

29 May | Steel News

Russia’s TMK reports lower net profit and revenues in 2023

01 Mar | Steel News

Russia’s stainless steel imports up 4.6 percent in July from June

24 Aug | Steel News

Marketplace Offers

ERW Longitudinal Galvanized Flat Pipe
External Diamater:  21.7 - 139.7 mm
Wall Thickness:  12.7 - 127 mm
CONARES METAL SUPPLY
ERW Longitudinal Black Pipe
External Diamater:  21.3 - 139.7 mm
Wall Thickness:  12.7 - 127 mm
CONARES METAL SUPPLY
ERW Longitudinal Black Pipe
External Diamater:  21.3 - 114.3 mm
Wall Thickness:  1.2 - 6 mm
INCOSTEEL