Tenaris to supply heavy wall pipe for Gulf of Mexico project

Tuesday, 30 July 2013 01:17:43 (GMT+3)   |   San Diego

Tenaris announced Monday that it is supplying offshore line pipe for Exxon Mobil's Julia Project, located 7,000 feet under the Gulf of Mexico. Products including 10.75-inch diameter X65QO pipes in wall thicknesses of 35 mm and 42 mm will be used for flowlines, risers, jumpers and flowline end terminations.

"Tenaris is now working on heavy wall pipes from 1.378 in. (35 mm) up to 2.165 in. (55 mm), in almost all our projects," said Philippe Darcis, Tenaris Line Pipe Product Engineering Manager.

Marketplace Offers

ERW Longitudinal Galvanized Flat Pipe

External Diamater 21.7 - 139.7 mm
Wall Thickness 12.7 - 127 mm
 
Tedarikçi CONARES METAL SUPPLY
View Offer

ERW Longitudinal Black Pipe

External Diamater 21.3 - 139.7 mm
Wall Thickness 12.7 - 127 mm
 
Tedarikçi CONARES METAL SUPPLY
View Offer

ERW Longitudinal Black Pipe

External Diamater 21.3 - 114.3 mm
Wall Thickness 1.2 - 6 mm
 
Tedarikçi INCOSTEEL
View Offer

Similar articles

Danieli to supply new roller hearth furnace to Tenaris Tamsa

Local Chinese pipe prices stable or down slightly amid weaker cost support

South Korea launches AD investigation into seamless steel pipes from China

Saudi Steel Pipe secures another oil and gas pipe contract from Aramco

Hoa Phat's steel sales rise 39% in Jan-Sept 2026

Vallourec wins TotalEnergies contract for over 16,000 mt of pipes for Azerbaijan's Absheron gas field

Local Chinese steel pipe prices stable or down slightly

EEC extends AD measures on seamless OCTG from China for another five years

US issues final AD results on circular welded pipe from UAE

France's steel product import value down one percent in Jan-Aug 2026