Tenaris to supply heavy wall pipe for Gulf of Mexico project

Tuesday, 30 July 2013 01:17:43 (GMT+3)   |   San Diego

Tenaris announced Monday that it is supplying offshore line pipe for Exxon Mobil's Julia Project, located 7,000 feet under the Gulf of Mexico. Products including 10.75-inch diameter X65QO pipes in wall thicknesses of 35 mm and 42 mm will be used for flowlines, risers, jumpers and flowline end terminations.

"Tenaris is now working on heavy wall pipes from 1.378 in. (35 mm) up to 2.165 in. (55 mm), in almost all our projects," said Philippe Darcis, Tenaris Line Pipe Product Engineering Manager.


Similar articles

Danieli to supply new roller hearth furnace to Tenaris Tamsa

17 Oct | Steel News

Saudi Steel Pipe announces $80 million offshore line pipe contract

30 Jan | Steel News

Japan's Daido Steel awarded engineering role for Nippon Steel's Setouchi EAF project

30 Jan | Steel News

Vallourec and XGS Energy partner to advance next-generation geothermal projects in US

30 Jan | Steel News

Local Chinese pipe prices mostly stable amid support from billet prices, with some slight downticks

29 Jan | Tube and Pipe

Chinese steel pipe export offer prices up slightly, local prices fluctuate

29 Jan | Tube and Pipe

Ukraine’s Interpipe secures pipe supply contract for Italian infrastructure project

29 Jan | Steel News

Tenaris awarded pipe supply contract for Sakarya gas field phase 3 in Turkey

29 Jan | Steel News

US rig count and Canadian rig count both increase - week 4, 2026

27 Jan | Steel News

Japanese crude steel output down four percent in 2025

26 Jan | Steel News

Marketplace Offers

ERW Longitudinal Galvanized Flat Pipe
External Diamater:  21.7 - 139.7 mm
Wall Thickness:  12.7 - 127 mm
CONARES METAL SUPPLY
ERW Longitudinal Black Pipe
External Diamater:  21.3 - 139.7 mm
Wall Thickness:  12.7 - 127 mm
CONARES METAL SUPPLY
ERW Longitudinal Black Pipe
External Diamater:  21.3 - 114.3 mm
Wall Thickness:  1.2 - 6 mm
INCOSTEEL