IPSCO to install OCTG finishing lines
Canadian steel producer IPSCO announced today that it will install high-speed Oil Country Tubular Goods (OCTG) finishing lines at its Blytheville, Arkansas pipe mill. The project is a part of company strategy to strengthen its position in the energy tubular products market. The Blytheville facility's lines will have a finishing capacity of 175'000 tons of OCTG products.IPSCO to install OCTG finishing lines
Similar articles
US issues preliminary results of CVD review on large diameter welded pipe from Türkiye
04 Jun | Steel News
Local Chinese steel pipe prices move sideways or fluctuate slightly amid declining billet prices
04 Jun | Tube and Pipe
Chinese steel pipe export offer prices rise further amid ongoing Middle East crisis
03 Jun | Tube and Pipe
Marketplace Offers
ERW Longitudinal Galvanized Flat Pipe
External Diamater: 21.7 - 139.7 mm
Wall Thickness: 12.7 - 127 mm
CONARES METAL SUPPLY
External Diamater: 21.7 - 139.7 mm
Wall Thickness: 12.7 - 127 mm
CONARES METAL SUPPLY
ERW Longitudinal Black Pipe
External Diamater: 21.3 - 139.7 mm
Wall Thickness: 12.7 - 127 mm
CONARES METAL SUPPLY
External Diamater: 21.3 - 139.7 mm
Wall Thickness: 12.7 - 127 mm
CONARES METAL SUPPLY
ERW Longitudinal Black Pipe
External Diamater: 21.3 - 114.3 mm
Wall Thickness: 1.2 - 6 mm
INCOSTEEL
External Diamater: 21.3 - 114.3 mm
Wall Thickness: 1.2 - 6 mm
INCOSTEEL