ChTPZ ships first LD steel pipes for Gazprom project

Monday, 25 August 2014 17:50:54 (GMT+3)   |   Istanbul

Russia-based steel pipe producer ChTPZ Group has announced that it has shipped the first 10,000 mt of large diameter (LD) steel pipes for Russian state gas monopoly Gazprom's Power of Siberia pipeline project.

The pipes with a diameter of 1,420 mm and a wall thickness of 21.7 mm produced at Chelyabinsk Pipe Rolling Plant are made of steel sheet grades produced by major Russian steelmakers MMK and Severstal.

The total shipments for the project will amount to more than 30,000 mt, the rest of which will be shipped in September-October this year.

Marketplace Offers

ERW Longitudinal Galvanized Flat Pipe

External Diamater 21.7 - 139.7 mm
Wall Thickness 12.7 - 127 mm
 
Tedarikçi CONARES METAL SUPPLY
View Offer

ERW Longitudinal Black Pipe

External Diamater 21.3 - 139.7 mm
Wall Thickness 12.7 - 127 mm
 
Tedarikçi CONARES METAL SUPPLY
View Offer

ERW Longitudinal Black Pipe

External Diamater 21.3 - 114.3 mm
Wall Thickness 1.2 - 6 mm
 
Tedarikçi INCOSTEEL
View Offer

Similar articles

ChTPZ to supply LD pipe for coastal part of Nord Stream 2 pipeline

ChTPZ Group produces new long steel pipe grade

ChTPZ’s Pervouralsk New Pipe Plant commissions new cold rolling mill

ChTPZ supplies LD pipes for Beineu-Bozoi-Shymkent gas pipeline

ChTPZ Group fulfils customized order for Uralvagonzavod

ChTPZ Group expands its premium-thread OCTG range

ChTPZ to supply 22,000 mt of LD pipes to Transneft in August

ChTPZ to supply large diameter pipes to Rosneft

ChTPZ completes program for replacement of imports of LD pipes

ChTPZ supplies LD pipes for Bovanenkovo-Ukhta pipeline