Uzghorod pipeline tender awarded to Khartsyzsk Pipe
Ukraine's number one large diameter longitudinal welded gas and oil pipes producer Khartsyzsk Pipe, won the tender to supply pipes for Bohorodchany-Uzhgorod gas pipeline. Considering that its annual pipe production capacity is 1.6 million tons, the Donetsk based company will spend four months to produce the pipes required for the gas pipeline project. Bohorodchany-Uzhgorod gas pipeline will be 234.3 km long. It will be made of steel pipes with a rust-proof layer. The gas pipeline will cross Ivano-Frankivsk and Transcarpathian regions of Ukraine. Khartszysk Pipe was selected among 15 bidders from Ukraine, Russia, France, Italy and Germany with an offer price 15% lower than the nearest bid.Uzghorod pipeline tender awarded to Khartsyzsk Pipe
Similar articles
US issues preliminary results of CVD review on large diameter welded pipe from Türkiye
04 Jun | Steel News
Local Chinese steel pipe prices move sideways or fluctuate slightly amid declining billet prices
04 Jun | Tube and Pipe
Chinese steel pipe export offer prices rise further amid ongoing Middle East crisis
03 Jun | Tube and Pipe
Marketplace Offers
ERW Longitudinal Galvanized Flat Pipe
External Diamater: 21.7 - 139.7 mm
Wall Thickness: 12.7 - 127 mm
CONARES METAL SUPPLY
External Diamater: 21.7 - 139.7 mm
Wall Thickness: 12.7 - 127 mm
CONARES METAL SUPPLY
ERW Longitudinal Black Pipe
External Diamater: 21.3 - 139.7 mm
Wall Thickness: 12.7 - 127 mm
CONARES METAL SUPPLY
External Diamater: 21.3 - 139.7 mm
Wall Thickness: 12.7 - 127 mm
CONARES METAL SUPPLY
ERW Longitudinal Black Pipe
External Diamater: 21.3 - 114.3 mm
Wall Thickness: 1.2 - 6 mm
INCOSTEEL
External Diamater: 21.3 - 114.3 mm
Wall Thickness: 1.2 - 6 mm
INCOSTEEL