Shahroud Steel commences pre-heating furnace

Thursday, 09 August 2007 14:03:17 (GMT+3)   |  

The Iranian steel producer Shahroud Steel, located on Shahroud-Damghan road, northeasten part of the country, has recently put into operation its pre-heating furnace. 

The plant, which has been built with an initial investment of Rial 68 billion ($3.34 million), is to produce 150,000 metric tons of finished steel products annually, such as debar, in the first phase.  

The main equipment for the plant was supplied by Italian company VAI Pomini at the cost of Rial 70 billion ($3.55 million). Meanwhile, the contracts for the supply of some structural and heavy equipment were awarded to Iranian local manufacturers.


Similar articles

US long steel prices steady as mill output continues up on solid domestic demand, low imports

21 May | Longs and Billet

Grupo SIMEC reports net profits slumped 85 percent from 2024 to 2025

13 Mar | Steel News

US domestic long steel prices flat to up, March scrap settles flat first time in three months

06 Mar | Longs and Billet

Mexico's rebar consumption down 29 percent in September

20 Nov | Steel News

Mexico's rebar consumption down 19 percent in August

15 Oct | Steel News

Rebar consumption in Mexico up 2.4 percent in May

30 Jul | Steel News

Mexican rebar consumption up 2.4 percent in February

18 Apr | Steel News

Rebar consumption in Mexico decreases 3.1 percent in January

27 Mar | Steel News

Rebar consumption in Mexico increases 5.7 percent in December

13 Feb | Steel News

Mexican rebar consumption and production increase in February

10 Apr | Steel News

Marketplace Offers

Deformed Bar
Diameter:  8 - 50 mm
SIDIROSTAL SA
Deformed Bar
Diameter:  8 - 40 mm
CONARES METAL SUPPLY
Deformed Bar
Diameter:  6 - 32 mm
ES ISO 6935-2 2019 B500BWR , ASTM A615 GR 60
YOTTA TRADING