Zhujiang Steel Pipe to hike capacity to 2.41 million mt by end of 2012

Tuesday, 26 June 2012 15:51:43 (GMT+3)   |  
Guangdong Province-based Chinese steel pipe manufacturer Zhujiang Steel Pipe has launched construction of the second phase of its new steel pipe project, as reported by local Chinese media.
 
The project is scheduled to be implemented in three phases. In the first phase, Zhujiang Steel Pipe invested RMB 700 million ($111.11 million) to build a longitudinal submerged arc welding pipe production line with a planned annual output capacity of 300,000 mt. In the second phase, Zhujiang Steel Pipe is going to add two longitudinal submerged arc welding pipe production lines and a spiral welded pipe production line before the end of 2012, increasing its overall annual production capacity from 1.45 million mt to 2.41 million mt. In the third phase, the company plans to construct a spiral welded pipe production line with a designed production capacity of 300,000 mt. In addition, it will also build a quayside warehouse. Zhujiang Steel Pipe will invest RMB 5 billion ($793.65 million) in the overall project, which is expected to contribute an annual output value of over RMB 10 billion ($1.59 billion).

Similar articles

Baoji Petroleum Steel Pipe produces first pipe at Karamay plant

27 Jun | Steel News

Tianjin Metallurgy No. 1 Steel commissions phase 1 of welded pipe project

23 May | Steel News

Three steelmakers in Jiangsu to eliminate outdated capacities in 2012

10 Apr | Steel News

Liaoyang Steel Tube starts production at welded pipe facility

02 Apr | Steel News

Chengdu Steel & Vanadium produces low-sulfur steel pipe

29 Mar | Steel News

Ductile pipe production increases in China’s Xinjiang region

28 Mar | Steel News

Molong Petroleum Machinery to commission oil pipe processing project

27 Mar | Steel News

Zhujiang Steel Pipe to commission first phase of Zhuhai project

22 Mar | Steel News

Baoji Petroleum Steel Pipe to supply pipes for Nanjiang gas project

15 Mar | Steel News

Jigang Group produces ultra-thick X70M pipeline steel

14 Mar | Steel News

Marketplace Offers

Welded Precision Tube
External Diamater:  16 - 114 mm
Wall Thickness:  1.5 - 3 mm
SC CLAR IMPORT EXPORT SRL
ERW Longitudinal Galvanized Flat Pipe
External Diamater:  21.7 - 139.7 mm
Wall Thickness:  12.7 - 127 mm
CONARES METAL SUPPLY
ERW Longitudinal Black Pipe
External Diamater:  21.3 - 139.7 mm
Wall Thickness:  12.7 - 127 mm
CONARES METAL SUPPLY