Metallurgical Arrigoni to build Chile’s first wind tower manufacturing plant

Wednesday, 08 June 2011 01:43:38 (GMT+3)   |  
       

The Latin American Wind Energy Association (LAWEA) reported that Chile-based steel fabricator Metallurgical Arrigoni will build South America's first wind turbine manufacturing facility.

The new plant will be built in Quilicura, in Chile's Santiago province, near Metallurgical Arrigoni's existing 20,000 metric ton capacity fabrication location.


Similar articles

Stocks of main finished steel products in China down 5.4% in mid-April

25 Apr | Steel News

Stocks of main finished steel products in China down 4.8% in early April

16 Apr | Steel News

Stocks of main finished steel products in China down 2.8% in late March

09 Apr | Steel News

Stocks of main finished steel products in China down 0.6 percent in mid-March

25 Mar | Steel News

Stocks of main finished steel products in China up 4.0 percent in early March

14 Mar | Steel News

Stocks of main finished steel products in China up 12.8% in late Feb

04 Mar | Steel News

Stocks of main finished steel products in China up 26.8% in mid-Feb

27 Feb | Steel News

UK’S TRA proposes safeguard extension for 15 steel product categories for further two years

22 Feb | Steel News

Stocks of main finished steel products in China up 10.4% in early Feb

20 Feb | Steel News

Stocks of main finished steel products in China up 5.2% in late Jan

06 Feb | Steel News