Ukraine’s Zaporizhstal starts overhaul at BF No.4

Friday, 21 June 2024 10:44:42 (GMT+3)   |   Istanbul

Ukraine-based Zaporizhstal steel mill, which belongs to Metinvest, has announced that it has started repair works at its blast furnace No.4. The company allocated more than UAH 92 million ($2.27 million) for the overhaul which will be completed in a week.

The overhaul will include the replacement of the three-cone loading device, repair of foundry equipment and key components of the air heater. In addition, the overhaul will involve maintenance of the foundry’s aspiration system, which will ensure reliable operation of environmental equipment during the furnace’s operation.

Meanwhile, Zaporizhstal completed an overhaul at its blast furnace No. 2 and commissioned the furnace in late-May, as SteelOrbis previously reported.

DamlaTükenmez
Damla Tükenmez
Editor

I graduated from the Department of English Language and Literature at Kocaeli University. Since 2020, I have been producing content focused on the steel industry. At SteelOrbis, I write industry news on a wide range of topics, including EU and UK trade measures, regulatory changes, quota utilization, and the statements and views of organizations representing the Turkish steel sector.

Similar articles

Ukraine’s Zaporizhstal to raise its investments to $26.43 million in 2025

Zaporizhstal invests UAH 1.8 billion in modernization projects in 2016

Zaporizhstal to modernize blast furnace No. 4 to reduce coke usage

Zaporizhstal to invest $1.5 billion in new converter shop

Zaporizhstal to invest UAH 12 million in 2014

Ukrainian steelmakers’ investments continue to fall in 2010

Zaporizhstal to commission new PCI plant in 2011

Ukrainian steelmakers’ investments in upgrades fall 12.2 percent in Jan-Sept

Zaporizhstal to start hot testing its new PCI plant in September

Ukrainian steelmakers’ investments in expansion fall 39.4 percent in Q1 2010