Samarco concludes works at Alegria Sul pit

Friday, 14 June 2019 23:26:17 (GMT+3)   |   Sao Paulo

Samarco, a 50/50 joint venture (JV) between Vale and BHP Billiton, concluded the first phase of works at its Alegria Sul pit, as part of a plan to resume operations. The pellet producer will no longer use an iron ore waste dam like the one that burst in November 2015. Instead, the waste will be directed to the Alegria Sul pit.

Works at the pit started in October 2018, as the company seeks a corrective operating license from Minas Gerais state environmental authority, Semad.

Marketplace Offers

DRI

Dimensions 9 - 16 mm
 
Tedarikçi SUEZ STEEL CO.
View Offer

Lumps

Dimensions 0 mm
 
Tedarikçi ATAY COMPANY
View Offer

Lumps

Dimensions 0 mm
 
Tedarikçi Wuchan zhongda international group
View Offer

Similar articles

Brazil's CSN posts Q3 2026 net loss amid continued high leverage

Brazilian iron ore exports increase 6.7 percent in October on more sales to Asia

Weekly Brazilian high-grade iron ore prices rise on restocking expectations

Vale's Q3 2026 net profit falls 53 percent as iron ore fines prices drop

Usiminas Q3 net profit falls 43.2 percent from Q2 on weaker operating performance

Samarco's Q3 2026 production at highest level since operations resumed in 2020

Brazilian high-grade iron ore prices edge higher week on week

Fifth Brazilian iron ore miner halts ops on high Brazil-China freight rates; low ore prices

Iron ore miner Cedro secures environmental license to build port in Brazil

Fourth Brazilian iron ore miner hit by Brazil-China freight rates and low ore prices