Primetals Technologies to supply two ladle furnaces for Germany-based HKM

Thursday, 11 January 2018 12:29:37 (GMT+3)   |   Istanbul

UK-based plantmaker Primetals Technologies has announced that it will supply two new ladle furnaces for German steel producer Hüttenwerke Krupp Mannesmann GmbH’s (HKM) LD basic oxygen furnace (BOF) plant at its Duisburg-Huckingen location. Commissioning of the new furnaces is scheduled for the fall of 2019.

According to Primetals Technologies, the ladle furnaces are designed for a fully automated annual treatment capacity of 5.6 million metric tons of liquid steel, and so are ready for Industry 4.0. The new furnaces will help to substantially reduce operating costs in the steel works. In addition, the phosphorous content of the melts can be reduced, and higher proportions of alloying elements can be processed.

Similar articles

ThyssenKrupp to invest in new galvanizing line at Dortmund plant

SMS to upgrade hot strip mill of ArcelorMittal Bremen

SMS to supply new billet caster for Saarstahl's Völklingen plant

Danieli to supply walking beam furnace for ArcelorMittal Hamburg

SMS revamps DC EAF of German steel producer Georgsmarienhütte

Dillinger Hütte starts producing slabs of up to 500 mm thick

Salzgitter to modernize blast furnace

JSPL Angul commissions largest high-speed billet caster in India

US-based Big River Steel builds complex for high-grade steel products

ANDRITZ to supply heat treatment plant for Turkey’s Kardemir