Primetals receives final acceptance from Trinecke Zelezarny for secondary dedusting system

Friday, 27 November 2015 17:48:49 (GMT+3)   |   Istanbul
       

UK-based plantmaker Primetals Technologies has announced that it has received the final acceptance certificate for the modernized secondary dedusting system installed at the Trinecke Zelezarny a.s. converter steel works located in Trineca in the Czech Republic.
 
The system removes the dust from two converter lines and secondary plant equipment. It is designed to purify 2.4 million cubic meters of gas per hour. 
 
The use of modern system control and blower drive technology optimizes energy consumption. The hot metal charging has also been speeded up to increase production capacity. Primetals Technologies received the order in December 2012. The first upgraded converter came into operation in October 2014, and the entire plant has been fully operational since the start of October 2015.

Tags: Czech Rep. Europe 

Similar articles

Liberty Ostrava receives approval to implement new carbon technologies

20 Aug | Steel News

Liberty Ostrava to temporarily halt BF No. 2 at end of April

17 Apr | Steel News

Liberty Ostrava signs agreement with union

13 Sep | Steel News

Liberty Ostrava posts net profit for 2018 amid higher output

27 Aug | Steel News

Liberty’s Ostrava steelworks cuts output 20 percent without job loss

17 Jul | Steel News

Czech Republic scrap exports in 2018

12 Feb | Steel News

EU-28 unemployment stable in May compared to April

05 Jul | Steel News

European welded pipe market awaits result of EU’s safeguard duty investigation

03 Jul | Tube and Pipe

ArcelorMittal sells Frydek-Mistek electrical steel plant to Stalprodukt

19 Dec | Steel News

Vitkovice Steel modernizes rolling mill to expand sheet piles output capacity

05 Oct | Steel News