Danieli to supply new finishing equipment to ArcelorMittal

Monday, 29 August 2016 16:59:22 (GMT+3)   |   Istanbul
       

Italian plantmaker Danieli has announced that it will supply new finishing equipment for global steel producer ArcelorMittal’s jumbo beam mill in Differdange, Luxembourg. 
 
The core of the project consists in the installation of a new 9-roll straightener, which will be the largest-ever built, to replace the manual straightening operations. The extension of the existing cooling bed, a new cold disc saw and related handling equipment including an automatic system to transfer the rolls from the production line to a new roll setup and preparation area, will complete the plant upgrade. The plant start-up is scheduled for the beginning of 2018.

Similar articles

SMS to upgrade hot strip mill of ArcelorMittal Bremen

10 Aug | Steel News

ArcelorMittal Zenica completes €30 million refurbishment project

28 Jun | Steel News

ArcelorMittal Tailored Blanks invests €7 million in new welding line in Uckange

25 Jun | Steel News

ArcelorMittal to achieve significant carbon reduction with €150 million project

11 Jun | Steel News

Andritz to supply direct-fired furnace for ArcelorMittal’s plant in Florange

15 Feb | Steel News

ArcelorMittal Bremen completes modernization at continuous casting plant

14 Dec | Steel News

SMS to modernize hot strip mill of ArcelorMittal Atlantique et Lorraine at Dunkirk

28 Sep | Steel News

ArcelorMittal to invest €96 million at Florange and Dunkerque sites in France

31 Jul | Steel News

ArcelorMittal Asturias starts production at revamped slab caster No. 1 in Avilés

22 Mar | Steel News

ArcelorMittal Asturias to reduce gas emissions at Gijón plant

21 Mar | Steel News