Baogang delivers heavy steel rails for Zhangjiakou-Tangshan railway

Wednesday, 04 February 2015 13:59:33 (GMT+3)   |   Shanghai
Inner Mongolia-based Chinese steelmaker Baotou Iron and Steel Co. (Baogang Group) has announced that on January 29 its rail and beam plant completed deliveries of an order for a total of 12,700 mt of heavy steel rails of 75 meters in length, welded together to form lengths of 500 meters, to construction sites of the Zhangjiakou-Tangshan railway. 

The Zhangjiakou-Tangshan railway has a planned length of 528 kilometers, and is designed for train speeds of 120-160 km per hour and will mainly be used for freight transportation. 


Similar articles

Valin Xiangtan Steel to build bar and flat steel production facility

01 Apr | Steel News

Turkey’s Icdas hikes its longs prices at end of month

31 Mar | Longs and Billet

Local Turkish merchant bar prices increase amid higher production costs

31 Mar | Longs and Billet

Local Indian rebar prices surge amid near panic restocking due to input supply disruptions

31 Mar | Longs and Billet

S. Arabia’s Hadeed hikes April longs prices amid rising costs, stable demand despite GCC tensions

31 Mar | Longs and Billet

Local Turkish wire rod prices rise amid expected energy price hikes in April

31 Mar | Longs and Billet

H-beam prices in local Chinese market - week 14, 2026

31 Mar | Longs and Billet

Russia’s MMK expands rebar portfolio with high-strength corrosion-resistant grades

31 Mar | Steel News

Sarralle to supply meltshop to Romania’s UMB Steel

31 Mar | Steel News

Major steel and raw material futures prices in China - March 31, 2026 

31 Mar | Longs and Billet