Shagang cuts ex-factory prices for mid-March

Wednesday, 11 March 2009 11:12:17 (GMT+3)   |  
On March 11, Jiangsu Province-based Shagang announced its ex-factory prices for mid-March. The details are as follows:

1. Rebar prices are down RMB 100/mt ($15/mt) from early March levels. Thus, the price of 14-25 mm diameter HRB 335 is now at RMB 3,350/mt ($490/mt).

2. Common carbon high speed wire rod prices have declined by RMB 100/mt ($15/mt). As a result, the price of 6.5 mm Q235 is at the level of RMB 3,400/mt ($498/mt).

All the above prices include 17 percent VAT and are effective from March 11 to March 20.

$1 = RMB 6.83

Marketplace Offers

Wire Rod

Diameter 6 - 16 mm
  TS708/S420/B420C/B420B
Tedarikçi DAVUTOĞLU METAL MAK. İNŞ. SAN. TİC. LTD ŞTİ.
View Offer

Wire Rod

Diameter 5.5 - 28 mm
  EN 10016-2 AISI1006/1008/1010/1012/1015/1017
Tedarikçi DAVUTOĞLU METAL MAK. İNŞ. SAN. TİC. LTD ŞTİ.
View Offer

Wire Mesh

Diameter 2.15 - 5 mm
  DIN 488, ASTM ve diğer uluslar arası standarlar
Tedarikçi DAVUTOĞLU METAL MAK. İNŞ. SAN. TİC. LTD ŞTİ.
View Offer

Similar articles

Shagang Group reduces longs prices for July

Shagang Group issues longs prices for mid-June

Chinese domestic longs prices start to pick up

Chinese long product prices continue to rise on a fluctuating trend

China’s rebar inventory slides for fourth straight week

Chinese longs market shows varied performance

Shagang ups longs prices for late October

Shagang reduces ex-factory longs prices for October

Shagang reduces ex-factory longs prices for late September

Shagang lowers ex-factory longs prices for mid-September