Steel processor SET Enterprises invests in new Alabama location

Tuesday, 10 May 2011 02:02:24 (GMT+3)   |  
       

Warren, Michigan-based steel processor SET Enterprises, Inc. announced Monday plans to build a new steel processing and service center location in Jackson, Alabama. At full operating levels the new facility will be capable of processing 360,00 net tons (326,588 metric tons) of material to support new steel production coming on line at ThyssenKrupp Steel USA in Calvert, Alabama and other Southeast steel manufacturers.

SET will invest an estimated $12 million for the first phase of construction, which will consist of two slitting lines, including one line with the capability of processing heavy gauge material up to .500". The facility is scheduled to begin production in early 2012.

A planned second phase would double the size of the facility and increase the processing capacity and services offered.


Similar articles

Sales by Brazilian flat steel distributors show small increase in March

25 Apr | Steel News

US HDG imports up 20.9 percent in March

25 Apr | Steel News

Flat steel prices in local Taiwanese market - week 17, 2024

25 Apr | Flats and Slab

Major steel and raw material futures prices in China – Apr 25, 2024 

25 Apr | Longs and Billet

Turkish flats spot prices decline amid weak demand

25 Apr | Flats and Slab

Chinese HDG export prices rise further, but at slower pace

25 Apr | Flats and Slab

Ex-India HDG prices decline but not enough to drive trade amid still low bids

25 Apr | Flats and Slab

MOC: Average steel prices in China up slightly during April 15-21

25 Apr | Steel News

Stocks of main finished steel products in China down 5.4% in mid-April

25 Apr | Steel News

China issues serious warnings to non-VAT exporters, effect on prices too uneven so far

24 Apr | Flats and Slab