Shanghai Shida Precision Stainless Steel starts production at Phase II project

Tuesday, 17 November 2009 14:07:30 (GMT+3)   |  
       

Chinese stainless steel producer Shanghai Shida Precision Stainless Steel lately held a ceremony to mark the start of production operations at its Phase II project.

With a total investment of $120 million, the steelmaker's Phase II project is built on a surface area of 83,000 m2 and includes a 1,250 mm 20-high rolling mill, degreasing equipment, vertical continuous bright annealing equipment, as well as machines for stretching, straightening and cutting.

As a result of the commencement of production at its Phase II project, Shanghai Shida Precision Stainless Steel now has an annual capacity of 56,000 mt of stainless steel strip with a minimum thickness of 0.03 mm and a maximum width of 1,210 mm.


Similar articles

Flat steel prices in local Taiwanese market - week 20, 2024

16 May | Flats and Slab

Local Chinese stainless steel prices fluctuate slightly, trade at normal levels

15 May | Flats and Slab

Ex-China stainless steel prices stable despite softer nickel prices

14 May | Flats and Slab

Finland’s Outokumpu to contribute to decarbonization of food and packaging industry

13 May | Steel News

Flat steel prices in local Taiwanese market - week 19, 2024

09 May | Flats and Slab

Local Chinese stainless steel prices stable or down slightly, demand sluggish

09 May | Flats and Slab

India’s JSL Limited supplies alloy steel for Indian Navy’s torpedo systems

08 May | Steel News

EU sets AD and CV duties on stainless CR products from three countries due to circumvention

08 May | Steel News

Ex-China stainless steel prices remain stable while stainless futures prices decline

07 May | Flats and Slab

Aperam posts net loss for Q1, expects higher EBITDA for Q2

07 May | Steel News