Severstal delivers last LD pipes for Transneft’s BPS construction

Friday, 21 May 2010 12:06:31 (GMT+3)   |  
       

The Russian steel producer Severstal has delivered the last batch of large diameter (LD) pipes to Russian state-owned oil transportation company Transneft for the construction of the second trunk line of the Baltic Pipeline System (BPS). The total volume of LD pipes shipped by Severstal for the construction of the first and second lines of the BPS oil pipeline has amounted to more than 75,000 mt.

Severstal started its first deliveries of LD pipes for the BPS oil pipeline in May last year. For BPS's second line, since November last year to April 2010 Severstal has shipped more than 46,000 mt of LD pipes. In addition, during this period, within the framework of supplies for Transneft's oil pipeline projects, Severstal has developed the production of 14 new types of pipes of 11 mm to 20 mm wall thickness.


Similar articles

Local Chinese steel pipe prices stable or up slightly

25 Apr | Tube and Pipe

Saudi Arabia’s Al Yamamah Steel begins production at newly expanded Jeddah pipe plant

25 Apr | Steel News

Japanese crude steel output up 2.9 percent in March from February

23 Apr | Steel News

US structural pipe and tube exports up 9.9 percent in February

22 Apr | Steel News

US rig count increases slightly while Canadian count plunges again

19 Apr | Steel News

US structural pipe and tube imports down 6.5 percent in February

19 Apr | Steel News

Local Chinese steel pipe prices fluctuate slightly or move sideways

19 Apr | Tube and Pipe

Turkey’s welded pipe exports up 26.3 percent in January-February

17 Apr | Steel News

Austria’s Benteler Steel/Tube to build HR seamless steel tubes threading facility in US

17 Apr | Steel News

Turkey’s Tosçelik to supply LD pipes to Rhine Water Pipeline project in Germany

16 Apr | Steel News