Rizhao Steel carries out hot run test on high-speed wire rod line No. 1

Thursday, 04 July 2013 15:47:34 (GMT+3)   |   Shanghai
       

Beijing-based state-owned China Metallurgical Group Corporation (MCC) has announced that a successful hot run test has been carried out at Chinese steelmaker Rizhao Steel's high-speed wire rod production line No. 1 in Yingkou in Liaoning Province. Construction work was carried out by MCC subsidiary MCC Tiangong Construction Group (CMTCC Group).

The high-speed wire rod production line No. 1 mainly produces 5.5-20 mm wire rod with smooth surface and 6-16 mm threaded wire rod.

The overall high-speed wire rod project in question, on which construction work commenced on November 9 last year, includes three production lines with a total annual output capacity of 2.1 million mt, with each production line having an annual output capacity of 700,000 mt of high-speed wire rod. The production lines Nos. 2 and 3 had previously started production.


Similar articles

Wire rod prices in Taiwanese domestic market - week 17, 2024

26 Apr | Longs and Billet

Stability in southern Europe longs market amid weak demand

26 Apr | Longs and Billet

Romanian mill cuts rebar prices amid very slow demand, traders’ offers stable

25 Apr | Longs and Billet

Ex-China wire rod prices stable, ex-ASEAN mills aim higher amid non-VAT inspections

25 Apr | Longs and Billet

Saudi Arabia’s Hadeed once again keeps offers stable for May

25 Apr | Longs and Billet

Turkey’s Kardemir cuts its wire rod prices

25 Apr | Longs and Billet

Turkey’s Kardemir reduces its wire rod prices for engineering grade products

25 Apr | Longs and Billet

Bulgarian longs market moves down amid sluggish demand

25 Apr | Longs and Billet

Stocks of main finished steel products in China down 5.4% in mid-April

25 Apr | Steel News

China issues serious warnings to non-VAT exporters, effect on prices too uneven so far

24 Apr | Flats and Slab