Kobe Steel to reline blast furnace No. 3 at Kakogawa plant

Wednesday, 14 May 2014 15:06:51 (GMT+3)   |   Istanbul
       

Japanese steelmaker Kobe Steel has announced its plans to reline blast furnace No. 3 at its Kakogawa works in western Japan. The company will shut down the blast furnace from the end of September 2016 for a 90-day period to undertake the work. Kobe Steel will then restart the blast furnace at the end of December of the same year. The renovation will cost approximately JPY 20 billion ($196.3 million).
 
According to Kobe Steel, operating costs will be reduced by further increasing the use of low-cost raw materials with Kobe Steel's production technology, which incorporates a high ratio of pulverized coal in blast furnace operations.
 
As previously announced, Kobe Steel plans to shut down the blast furnace and other upstream operations at its Kobe works and transfer those operations to the Kakogawa works in the financial year 2016-17. The relining of the blast furnace No. 3 is timed in anticipation of this transfer.

Similar articles

Japan’s Kobe Steel launches corrosion-resistant steel sheet

12 Mar | Steel News

Kobe Steel’s net profit reaches record high in April-December

13 Feb | Steel News

Kobe Steel cuts BF carbon emissions by 25% at Kakogawa Works with new technology

19 Oct | Steel News

Japan’s Kobe Steel provides low carbon steel to Toyota

06 Jul | Steel News

Kobe Steel sees higher sales revenues in FY 2022-23 amid increased prices

11 May | Steel News

Kobe Steel’s net profit declines in Apr-Dec, forecasts for full year fall

09 Feb | Steel News

Kobe Steel to supply low-carbon steel to Nissan for use in vehicle production

20 Dec | Steel News

Kobe Steel posts higher sales revenues for H1 amid better sales prices

11 Nov | Steel News

Kobe Steel expects lower sales volume amid slow demand recovery in auto sector

09 Aug | Steel News

Kobe Steel to launch Japan’s first low carbon BF steel

17 May | Steel News