EAF-1 of BMZ produces 15 millionth metric ton of steel

Friday, 17 October 2014 17:02:44 (GMT+3)   |  
       

Belarus-based Byelorussian Steel Works (BMZ) has stated the electric arc furnace-1 at its Electric Steel Melting Shop-1 has produced its 15 millionth metric ton of steel, as the thirtieth anniversary of the foundation of BMZ approaches.

On October 9, workers produced the 15 millionth metric ton of steel at the reconstructed EAF-1 with which the history of BMZ started. The steel in question was cast at the CC Machine-1. 66, producing 140 x 140 mm square billets, for rolling into rebars with a diameter range from 10 mm to 32 mm.

In total, over 30 years 32.975 million mt of steel have been melted at the Electric Steel Melting Shop-1. The overall production of the steelmaker's two melting shops in the given period totals about 43.3 million mt.


Similar articles

ASEAN billet exporters have to cut offers from previous “unreasonable” level, deal prices stable

30 Apr | Longs and Billet

Kardemir’s billet sales dampen bullish mood among ex-Black Sea suppliers

26 Apr | Longs and Billet

Global View on Billet: Market at crossroads as Asian mills remain bullish, MENA unable to follow

26 Apr | Longs and Billet

Ex-ASEAN billet exporters bullish after news from China

25 Apr | Longs and Billet

SE Asia’s import billet market still resists sellers’ attempts to hike prices, deals rare

25 Apr | Longs and Billet

Iran floats new billet export tenders, price expectations weak

25 Apr | Longs and Billet

Asian billet prices rise in Turkey, but yet to see buyers’ acceptance

24 Apr | Longs and Billet

Ex-India billet prices stable, sellers still hope for improvement amid stable local demand

24 Apr | Longs and Billet

ASEAN mills not in hurry to sell semis, awaiting for further strengthening of market

23 Apr | Longs and Billet

India’s RINL floats export tender for 30,000 mt of billet for early June shipment

22 Apr | Longs and Billet