Yazd Steel to start operating I-beam line within six months

Wednesday, 25 April 2007 15:12:46 (GMT+3)   |  
The managing director of the Iranian steel producer Yazd Steel, Mr. Seyed Mohammad Ahramian, has announced that a new I-beam production line will be put in operation at their plant within the next six months. In addition, Mr. Ahramian said that another two I-beam production lines, with an annual capacity of 500,000 metric tons each, are currently 70 percent completed. These two lines will reach their designed production capacities in gradual steps up to the Iranian year 1388 (begins on 21.03.2009). Mr. Ahramian went on to add that a wire rod production line with an annual output capacity of 400,000 metric tons will commence operations by June 2007.

Similar articles

Kobe Steel’s wire rod processing venture in China to expand capacity

10 Nov | Steel News

Davis Wire employees in Washington go on strike

22 May | Steel News

Steel Scene longs panel: Are dumping cases on the horizon for the US’ wire rod and rebar market?

11 May | Steel News

Zenith Steel produces 72A wire rod for use in bead wire for tires

11 Apr | Steel News

Insteel Industries reports a net loss in Q1 financial results

20 Jan | Steel News

Kobe Steel to expand capacity at Chinese wire rod processing JV

18 Nov | Steel News

Specialty grade shortage sends US wire prices soaring

17 Mar | Longs and Billet

Slovakia Steel Mills to start test operations at its new rolling facility

07 Mar | Steel News

REMZ increases steel billet output by 76 percent in 2010

14 Jan | Steel News

US wire market sees sustainable demand just around the corner

09 Apr | Longs and Billet

Marketplace Offers

Wire Rod
Diameter:  1.3 - 2.2 mm
SIDIROSTAL SA
Wire Mesh
Diameter:  5 mm
SIDIROSTAL SA
Wire Rod
Diameter:  6 - 16 mm
TS708/S420/B420C/B420B
DAVUTOĞLU METAL MAK. İNŞ. SAN. TİC. LTD ŞTİ.