Long steel production line of Fangchenggang steel production base (the first phase) of Guangxi Province-based Liuzhou Iron and Steel Group was put into operation on May 22, as announced by Liuzhou Steel Group.
There are four rebar production lines and three wire rod production lines, with an overall annual capacity of 5.4 million mt in the first phase in question. After launch of mentioned rebar line all equipment for the first phase of the project are in operation.