Kloeckner to open expanded flat rolled facility in May

Tuesday, 25 April 2017 00:16:47 (GMT+3)   |   San Diego
       

Kloeckner Metals Corporation will officially open its new 106,000-square-foot flat rolled facility in University Park, Illinois on May 3.
 
The expanded facility will include new equipment such as a 72-inch slitter and a cut-to-length line with multiple cassettes to enable more efficient processing of heavy and light gauge materials. Additionally, the company’s existing equipment was rebuilt and remanufactured, with the latest in precision controls and software to insure close tolerance, cut-to-length and slitting work.
 
The expansion also includes increased crane capacity and a larger variety of metal products, and the new plant’s location provides ingress/egress convenience sitting along a railroad siding so material can be received directly from rail cars.
 
In a statement announcing the opening, Kloeckner said it is optimistic about doubling the size of this new facility within the next few years.

Tags: US North America 

Similar articles

ISRI rebrands as ReMA

18 Apr | Steel News

US domestic rebar prices trending firm

18 Apr | Longs and Billet

US scrap market shows signs of another sideways trend in May

18 Apr | Scrap & Raw Materials

US plate prices mostly steady on adequate supply

18 Apr | Flats and Slab

US rebar exports up 60.4 percent in February

18 Apr | Steel News

US mechanical tubing imports down 15.9 percent in February

18 Apr | Steel News

US import rebar prices remain steady

17 Apr | Longs and Billet

AISI applauds Biden’s call to triple existing tariffs on Chinese steel imports

17 Apr | Steel News

US beam exports up 16.3 percent in February

17 Apr | Steel News

US hot rolled bar imports down 38.9 percent in February

17 Apr | Steel News